Wednesday, 28 March 2012

Difference between Waterfall Model and V Model


    Waterfall Model: It includes all phases of SDLC but the drawback is once requirement made freezed it cannot be changed.
  • Waterfall Model the tester role will take place only in the test phase
  • Waterfall madel is a fixed process u can't make any changes in the requirement or in any phase
  • waterfall model used only the requirements are fixed


    V-Model: In this model all phases will be done correspondently development and testing.
  • V-Model role will take place in the requirement phase itself
  • V-Model u can make any changes in the requirements
  • V-model is the simultaneous process but it is not in case of water fall model
  • V-model can be used for the any type of requirement(Uncertain requirement)